Skip to content
Noseberry Digitals
Project launch SEO

Real estate project launch SEO. Rank, capture, and convert from day one

Pre-launch site, content, and authority work designed for new project launches. Built so your launch ranks for the project name and the broader category before opening day. 8–14 weeks.

Pre-launch programme · Day-one rank · 100+ real estate launches

Trusted by 50+ operators, PropTech companies & digital-first brands

  • Harrington HousingHarrington Housing
  • Hive ColivHive Coliv
  • Edge LivingEdge Living
  • CDA ColivingCDA Coliving
  • FllatFllat
  • VolleyVolley
  • TheVibesTheVibes
  • CasaPayCasaPay
  • JumboTigerJumboTiger
  • Everything ColivingEverything Coliving
  • BookmycolivingBookmycoliving
  • BhutaniBhutani
  • GulshanGulshan
  • Harrington HousingHarrington Housing
  • Hive ColivHive Coliv
  • Edge LivingEdge Living
  • CDA ColivingCDA Coliving
  • FllatFllat
  • VolleyVolley
  • TheVibesTheVibes
  • CasaPayCasaPay
  • JumboTigerJumboTiger
  • Everything ColivingEverything Coliving
  • BookmycolivingBookmycoliving
  • BhutaniBhutani
  • GulshanGulshan
  • CRCCRC
  • M3MM3M
  • GodrejGodrej
  • OmaxeOmaxe
  • SikkaSikka
  • LodhaLodha
  • MahagunMahagun
  • PrestigePrestige
  • SawasdeeSawasdee
  • CRCCRC
  • M3MM3M
  • GodrejGodrej
  • OmaxeOmaxe
  • SikkaSikka
  • LodhaLodha
  • MahagunMahagun
  • PrestigePrestige
  • SawasdeeSawasdee
Who it’s for

Built for these operators

  • Real estate developers

    Launching a new residential / commercial / mixed-use project (Lodha, Godrej, M3M-tier ICP).

  • Coliving and BTR operators

    Opening a new property in a fresh market.

  • PropTech startups

    About to launch publicly with a defined ICP.

  • Branded-residence operators

    Launching a new flagship.

  • Hotel and serviced-apartment operators

    Opening a new flag.

  • Real estate marketplaces

    Launching in a new geo.

What’s included

Everything you need, in one engagement

  • Pre-launch SEO sprint

    Site build + technical + schema + initial content all live before launch day.

  • Project-name brand-defence

    Brand SEO so your project ranks #1 for its own name on day one.

  • Category SEO

    "[city] new launch", "[neighbourhood] new project", "[bedroom-type] [city]" pre-positioning.

  • Content engine

    Neighbourhood guide, project intro, amenities deep-dive, lifestyle content. 8–25 pieces.

  • Authority pre-build

    8–16 launch placements scheduled to land in launch week.

  • Local SEO

    GBP, citations, local schema all live.

  • Press kit + data-PR coordination

    With internal / external PR teams.

  • 90-day post-launch optimisation

    Adjust based on what's actually converting.

How we work

A predictable, weekly cadence

  1. Step 01

    Pre-launch audit (Weeks -14 to -10)

    Competitive landscape, target keywords, ranking floor.

  2. Step 02

    Site + tech + schema (Weeks -10 to -4)

    Full site live with all infrastructure.

  3. Step 03

    Content + authority (Weeks -8 to -2)

    Content engine deployed. Authority placements scheduled.

  4. Step 04

    Launch week

    Coordinated rollout. Press, content, ads, social all aligned.

  5. Step 05

    Post-launch (Weeks +1 to +4)

    Measure, adjust, double-down on what's converting.

  6. Step 06

    Compounding (Months 2–3)

    Programmatic content expansion, authority compounding.

Tech & methodology

Opinionated for real estate

  • Stack

    • GSC + GA4 + Looker Studio dashboards (live before launch)
    • Pitchbox + manual outreach + data-PR
    • Long-form pillar + cluster + local content
    • RealEstateAgent + Apartment + ApartmentComplex + Service + FAQ schema
Selected work

Real engagements, real outcomes

  • Indian developer (project launch)

    Pre-launch SEO + content.

    • 4.3K monthly users by month-3 post-launch on project + neighbourhood queries
  • Coliving operator (Toronto launch)

    Day-one ranks on "[neighbourhood] coliving".

    • 40% of launch enquiries via organic
  • UAE branded residence

    Launch SEO bundle.

    • Project ranked #1 for own name
    • 30% top-3 on neighbourhood
Outcomes

What clients walk away with

  • #1

    ranking on project name by launch day across last 12 launches

  • 30%+

    organic share of launch-window enquiries on average

  • 22 days

    average ranking time to top-3 on project-name

  • 3.4×

    organic traffic vs. comparable launches without pre-launch SEO

Pricing

Pick the tier that fits

  • Single-project launch (entry)

    8–10 weeks

    • Full pre-launch + 30-day post
    • Project-name brand defence
    • Content + authority foundation
    Plan launch
  • Most popular

    Premium launch

    –25K

    10–14 weeks

    • Full pre-launch + 90-day post
    • Content engine + data-PR
    • Local SEO + GBP build
    Plan premium launch
  • Multi-project / portfolio launch

    Per portfolio

    • 3+ projects / multi-market launches
    • Embedded launch ops
    • Programmatic content
    Plan portfolio launch
How we compare

Side-by-side, with the alternatives

  • Real estate launch playbook

    Noseberry
    Real estate marketing agency
    Sometimes
    In-house team
    Internal
    Generic SEO
  • Day-one rank capability

    Noseberry
    Real estate marketing agency
    Mixed
    In-house team
    Mixed
    Generic SEO
  • Schema-first build

    Noseberry
    Real estate marketing agency
    In-house team
    Mixed
    Generic SEO
    Sometimes
  • Authority pre-build

    Noseberry
    Real estate marketing agency
    In-house team
    Generic SEO
    Mixed
  • Coordinated press + content + tech

    Noseberry
    Real estate marketing agency
    In-house team
    Hard
    Generic SEO
FAQ

Frequently asked questions

Can I start 4 weeks before launch?

Possible but suboptimal. 8 weeks minimum for full programme; 14 weeks for premium scope.

Do you handle PR or just SEO?

SEO + content + authority. PR coordinated with your existing PR firm or /real-estate-pr-services.

Will you work on the project's main developer site or a dedicated project microsite?

Either. Most clients pick a dedicated microsite.

What if launch slips by 2 weeks?

Standard. We plan for ±4-week launch flexibility.

Do you build the site or work on existing?

Both options. Most launches build a new microsite (/real-estate-website-development).

What about post-launch. Do I need a retainer?

Optional. 30-day post-launch is included; ongoing SEO sold separately if pipeline demands it.

Ready when you are

–30K 8–14 weeks?

Scope my launch SEO. –30K · 8–14 weeks.

No commitment · Reply within 24 hours · Join 100+ real estate brands